Vinyl sheet floor covering

Always follow manufacturers installation notes. Vinyl sheet will not allow moisture to pass through it, particular care must be taken to ensure that the screed has been properly warmed and dried out prior to laying vinyl. Turn the floor heating off for 2 days prior to sticking the vinyl down, leave off for a further 2 days to allow adhesive to set. The same applies to a tiled floor when using tile adhesive and tile grout. It is recommended that you use specific adhesive products which are suitable for use with underfloor heating. These products will have a higher temperature rating and will be flexible.

If in doubt, please get in touch.